PARKING LOT BEHIND THE CHURCH. PHOTO ABOVE WAS DAY 1...
YESTERDAY. THE OLD ASPLHALT ALREADY GONE AND LOWERING
AND LEVELING THE LOT CAME NEXT. THIS PHOTO LOOKING NORTH.
THIS AFTERNOON, DAY 2, FINAL GRADING IS BEING DONE AND SAND
IS BEING SPREAD AT THE REAR, CLOSE TO THE ENTRANCE TO CHRUCH.
THIS PHOTO LOOKING SOUTH. ONCE SAND IS EVENED THROUGHOUT,
THE CONCRETE WILL BE POURED. NEXT PHOTO WILL BE OF
FINISHED LOT. THE LOT WAS IN BAD SHAPE AND THIS WAS JOB WAS NEEDED AND WILL BE LIKED BY ALL.
VETERAN'S MEMORIAL BETWEEN MT. HOPE AND
SACRED HEART CEMETERIES. WAY BACK, BY ALL THE
FLAGS, A HUGE TANK SUPPLYING WATER FOR THE
PROJECT. IT WILL BE GONE SOON. NOTE THE TWO
ROUND CONCRETE CIRCLES. THE BACK
ONE IS HARD TO SEE IN PHOTO. NOTE THE
YET-TO-BE-POURED WALKWAYS THAT WILL RUN FROM
YET-TO-BE-POURED WALKWAYS THAT WILL RUN FROM
THE STREET ALL THE WAY TO THE 5 SERVICE STONES WAY BACK.
THE NORTH CIRCLE HAS THE U.S. FLAG IN THE
MIDDLE OF IT. NOT SURE WHAT WILL BE IN
THE FOREGROUND CIRCLE. NOT VISABLE TO LEFT,
A ROW OF EVERGREEN TREES WHICH AS THEY GROW
WILL FORM A TREE FENCE AND BLOCK OUT THE
HOUSE TO THE LEFT. WHAT DO I THINK?
I THINK IT IS LOOKING GREAT!
THE ABOVE MOVIE STARTS FRIDAY NIGHT AT THE
VOY THEATRE AND THE 61 DRIVE-IN.
DENNIS VOY